image image image
Khazar Steel Complex Khazar Steel Complex ASYN provided consultancy, supervision and engineering for installation, Commissioning and operation of Khazar Steel Complex for 100 tons Electric Arc furnace and Continuous Casting Machine.
Pasargad Steel Making Plant ASYN Provides Engineering Manufacturing , Management And Supervision For Pasargad Steel complex with capacity of 1,500,000 tpy steelmaking plant as the largest SMP Project of Private sector in Iran  
Natanz Steel Complex ASYN provided consultancy and engineering to make solutions for improvement in natanz steel plant. ASE crew made an onsite investigation on Natanz SMP2 and provided a wise project plan for improvement in logistics, equipment, and operational improvement in both long and short term categories.

Feature 1

Ironmaking

Depending on your requirements, we have the background, experience and expertise to advise you with respect the optimum ironmaking route and plant equipment.

Feature 2

Steelmaking

Depending on your requirements, we have the background, experience and expertise to advise you with respect the optimum steelmaking route and plant equipment.

Feature 3

Industrial Gases

High-efficiency and energy-saving Air Separation plants (cryogenic, PSA/VPSA) and associated equipment to the metallurgical, petrochemical, LNG and health industries are ASYN’s profession.

Khazar Steel Complex

Khazar Steel Complex

ASYN provided consultancy, supervision and engineering for installation, Commissioning and operation of Khazar Steel Complex for 100 tons Electric Arc furnace and Continuous Casting Machine.