Completed Projects

  • 2.5 MTPY Pasargad Steel Complex Pelletizing Plant
    • Capacity: 3,500 Nm3/hr Oxygen
    • Location: Yazd, IRAN.
  • Yazd Rolling Mill Complex Fume Treatment Plant
    • Capacity: 510,000 m3/hr de-dusting
    • Location: Yazd, IRAN.
  • Yazd Rolling Mill Complex Air Separation Plant
    • Capacity: 3,500 Nm3/hr Oxygen
    • Location: Yazd, IRAN.
  • ChadorMalu Iron Ore 5th Line Concentration Plant
    • Capacity: 2,500,000 tpy Iron Ore Concentrate
    • Location: Yazd, IRAN.
  • Moabarakeh Saba Steel Complex Direct Reduction Plant
    • Capacity: 1,500,000 tpy DRI
    • Location: Isfahan, IRAN.
  • Mobarakeh Steel Complex, Shahid Kharrazi Direct Reduction Plant
    • Capacity: 800,000 tpy DRI
    • Location: Isfahan, IRAN.
  • EAF Dynamic Process Simulation
    • Scope of work: Software design and development
    • Client: Badische Stahl Engineering (Germany)
  • Shadegan Steel Complex Direct Reduction Plant (PERED)
    • Capacity: 800,000 tpy DRI
    • Location: Ahvaz, IRAN.
  • Saba Steel Complex Direct Reduction Plant Recuperator (Heat Recovery System)
    • Scope of work: Basic & Detail Design
    • Location: Isfahan, IRAN.
  • Sabzevar Steel Complex Direct Reduction Plant
    • Capacity: 800,000 tpy DRI
    • Location: Khorasan, IRAN.
  • Arvand Steel Complex
    • Capacity: -
    • Location: Khorramshahr, IRAN.
  • Chahar Mahal Steel Complex Direct Reduction Plant
    • Capacity: 800,000 tpy DRI
    • Location: Sepid Dasht, IRAN.
  • Grate Pelletizing Indurating Furnace Process
    • Scope of work: Software design and development
    • Client: MMTE Co.
  • South Kaveh Steel (SKS) Direct Reduction Plant
    • Capacity: 1,600,000 tpy DRI
    • Location: Bandar Abbas, IRAN.
  • FARAD Steel Complex
    • Capacity: --
    • Location: Yazd, IRAN.
  • Hormozgan Steel Complex (HOSCO) Direct Reduction Plant
    • Capacity: 1,600,000 tpy DRI
    • Location: Bandar Abbas, IRAN.
  • Midrex Mega Module Direct Reduction Plant
    • Scope of work: Developing Process Modeling Software and Mass-Energy Balance production
    • Client: MMTE Co.
  • Midrex Direct Reduction Plant (600 Series)
    • Scope of work: Developing Process Modeling Software and Mass-Energy Balance automatic production
    • Client: MMTE Co.
  • Gol-e-Gohar Iron Ore Pelletizing Plant
    • Capacity: 5,000,000 tpy Pellet
    • Location: Sirjan, IRAN.
  • Khouzestan Steel Complex (Zamzam II) Direct Reduction Plant
    • Capacity: 800,000 tpy DRI
    • Location: Ahvaz, IRAN.
  • BAFT Steel Complex:
    • Capacity: 1,160,000,000
    • Location: Baft, IRAN
  • Chadormalou Line 5th:
    • Capacity:
    • Location: Yazd, IRAN

 

For more information about ASYN's scope of works in mentioned projects, please don't hesitate to contact us.